< PREWX CLOSENEXT >
SAFIR-2 PRESIDENT OF UZBEKISTAN GUEST HOUSE RENOVATION
safir-2-renovasyon_3_11_2017_1509695299-1.jpeg
safir-2-renovasyon_3_11_2017_1509695238-2.jpeg
safir-2-renovasyon_3_11_2017_1509695238-3.jpeg
safir-2-renovasyon_3_11_2017_1509695299-4.jpeg
    CONTINENT
  • ASIA
  • COUNTRY
  • UZBEKISTAN
  • YEAR
  • 2017
  • MAIN CONTRACTOR
  • APEAS
  • CLIENT
  • GOVERMENT
  • MAIN AREA
  • 4.200 m²
  • CATEGORY
  • Government Building
  • DESCRIPTION
  • Electrical
    Weak Current Systems: Fire alarm system, data-telephone structural cabling system, passive&active network system equipments,building management system cabling and equipment and panelboard connections. Power systems:UPS,LV panelboards,lighting installations, switches&sockets, earthing and all power cabling installations. Project is turn-key and lump sum including all these systems.