< PREWX CLOSENEXT >
SAFIR-2 PRESIDENT OF UZBEKISTAN GUEST HOUSE RENOVATION
-
CONTINENT
- ASIA COUNTRY
- UZBEKISTAN YEAR
- 2017 MAIN CONTRACTOR
- APEAS CLIENT
- GOVERMENT MAIN AREA
- 4.200 m² CATEGORY
- Government Building DESCRIPTION
- Electrical
Weak Current Systems: Fire alarm system, data-telephone structural cabling system, passive&active network system equipments,building management system cabling and equipment and panelboard connections. Power systems:UPS,LV panelboards,lighting installations, switches&sockets, earthing and all power cabling installations. Project is turn-key and lump sum including all these systems.